We were asked to upgrade the supply to the multi-storey car park at Yeovil Hospital.
Liaising with the electricity board, we proceeded with replacing the existing LV panel board within the car park with a new Schenider panel board with surge protection and metering.
An industrial ladder was installed across the ground floor car park, bolted to the steel work. A new 250 amp supply was installed onto the tray and through ducting to a new enclosure, that housed a new 250 amp Schenider panel board. From this panel, new supplies were run out to new GRP enclosures that housed Schenider distribution boards for local circuits.
The work was challenging in all aspects, but from start to finish all who were involved produced an excellent piece of work they can all be proud of. Well done team!