Works are now fully underway at Merck, installing the new intake supplies and switch panels. Dan and Simon successfully dragged in 3 x 4 core 240mm CSA SWA’s and terminated them over the weekend.
The weather was against them but with a great never say die attitude and great skill, it was all achieved.